Audax Innovation  /  Interventions

03 · Portfolio Management

Implement Product Portfolio Management

Duration14 weeksBudget$18,000FormatExcel tools, coaching and portfolio review

The goal of this intervention is to implement tools and an analysis method for the current product portfolio in order to identify underperforming products and make decisions in a proactive manner. The proposed methodology aims to develop tools to better structure the analysis of products and facilitate decision making with an approach that can be reused in the future.

Objectives

  • Transfer knowledge in product life cycle management.
  • Identify underperforming products to be withdrawn.

Deliverables

  • A proposal of objectives.
  • Withdrawal criteria based on financial and operational imperatives.
  • Excel tools for portfolio analysis.
  • Coaching sessions with two product managers.
  • Material for the meeting (if selected).
  • Meeting facilitation and report (if selected).

Intervention Methodology

Four phases, from assessing the existing tools to supporting the implementation of the decisions. Most of the work is done remotely; only the portfolio review and the analysis support take place on site.

Phase 1Preparation

Assessment of the current situation

Remotely

Assessment of available tools and data

Remotely

5 individual interviews

Remotely

Development / adaptation of tools

Remotely

Validation of tools with a category

Phase 2Analysis

Product analysis

Remotely

Support for the production of analysis documents

On site

Support for analysis and recommendations

Phase 3Decision

Portfolio review

Remotely

Plan the portfolio review

Remotely

Prepare and send documents to participants

On site

Facilitate the portfolio review and write the minutes of the meeting

Phase 4Implementation

Implementation

Remotely

Analysis of the impact of decisions and support for implementation

Detailed Intervention Description

Four phases over 14 weeks. Expand each phase to see its activities, schedule and budget.

Phase 1 — Preparation (Weeks 1–4)

Evaluate current product life cycle management with reference to

  • Tools used for product management
  • Available data
  • Criteria used for the withdrawal of products in decline
  • Links to innovation management and new product introduction

Prepare the tools and the objectives

  • Define specific withdrawal goals and criteria
  • Develop / adapt Excel tools in collaboration with the team
  • Agree on a format for the presentation of analyses and recommendations
  • Evaluate the need to use a software
  • Validate the developed tool with a product category

Phase Subtotal$5,000

Phase 2 — Analysis (Weeks 5–8)

Support the team in producing analysis documents

  • Consolidate data, generate graphs and create a summary page per product family, including status in the life cycle
  • Breakdown of sales and product margins by variant
  • The evolution of sales and margins in order to know the trend

Coach two (2) product managers

  • Prepare their first portfolio review, notably on the decisions to be made

Phase Subtotal$6,000

Phase 3 — Decisions (Weeks 9–10)
  • Plan the portfolio review
  • Prepare and send documents to participants
  • Facilitate the portfolio review and write the minutes of the meeting

Phase Subtotal$4,000

Phase 4 — Implementation (Weeks 10–14)
  • Coach two (2) product managers in the implementation of the decisions made through portfolio management
  • Evaluate the impact on customers and inventory

Phase Subtotal$3,000

Included in the Intervention

Skills Transfer

Knowledge in product life cycle management is transferred to your team.

Total Budget

$18,000

Travel expenses, to be assessed according to your location, may be added to the budget.